Penzance Heliport
Location: Penzance, Cornwall
Status: Completed 2019
Client: Penzance Heliport Ltd
MBA completed the Civil and Structural engineering design for the new hanger and terminal buildings allowing helicopter operations to continue to serve the Isles of Scilly.
MBA designed the large Bowstring steelwork trusses which spanned 35m across the hanger building which formed part of our steel frame design. MBA used 3D modelling software to optimise the designs throughout.